Shopping Centre - Reading. |
![]() |
![]() |
|
Brief Job Description - This structure was deisgined to fit alongside the clients current building and as you can see by the picture below it took some neat design and manufacturing techniques to successfully achieve the finished product. Contract Period - 10 weeks / February - Aprill 2007 Job Weight - 240 Tonnes, 3.5 Tonne Washroom Design - Full 2D CAD generated architectural drawings. - 2 weeks Manufacture - Inhouse manufacture and shipping - 4 weeks Contruction - Onsite erection and commission - 3.5 weeks |
| More Pics: See Below |
View from inside the site as the structures goes up. |
Roof & curved fabrication sections .. |
Inside the structure... |
Main section complete. |
| Unit 3 - Springhill Trading Estate, Aston Street, Shifnal, TF11 8DR / Tel: +44 (0)1952 463737 Fax: +44 (0)1952 463797 info@steelframestructuresltd.co.uk |